The Coronado National Forest recently released its 15-year trail plan for the Catalina Ranger District. Public comments are being solicited until December 2nd, and there is a public meeting scheduled for November 17th from 5-7:00 PM at the Jewish Community Center on River Road. You can also review the entire plan here

Summary

  • 22 trail development projects
  • 18 access or trailhead projects
  • Little emphasis on motorized recreation since these are just under 6% of the trails, most of which are in Redington Pass area.
  • Only about 50 miles of current trails are really bikeable (about 20% of existing trails on the CNF).  The trail system has a lopsided range of difficulty which the Forest Service is attempting to correct.
  • There are currently about 240 miles of non-motorized unauthorized trails with 40 miles of those getting regular use.
  • Trail system in this plan will grow by 10% or about 55-80 miles of proposed new trails. Many will be beginner or intermediate trails.

    Removal of 25 miles of existing trails that are low use, unsustainable, or unauthorized.

    Nothing in the plan is cast in stone and could be modified and changed depending on results of a full NEPA review of each project or group of projects is submitted. Projects are conceptual only—specific locations and trail alignments may change (p. 4).

    Goal 1— Create a system of trails that will meet current and future users. (p. 27)

  • Seek access—resolve one issue each 3 years
  • Improve parking
  • Protect the AZT
  • Provide full range of difficulty w/focus on beginner and intermediate trails
  • Increase trail system mileage by 25 miles or 10% including both adoption of unauthorized trails and new construction.

  • Goal 2 —Improve trail conditions and quality.  (p. 28)

  • Increase external support in volunteer hours and 3 rd party contributions.

  • Goal 3 —Mitigate the proliferation of unauthorized trails.

    Goal 4 —Effectively manage trails to reduce user conflicts.

  • Emphasize trail etiquette
  • Create directional MTB trails
  • Improve sight lines and tread surface
  • Scheduling—look at add/even days for usage between MTB’ers and hikers

Goal 5 —Advance non-recreation program goals (fire breaks, wildlife, move trails away from nearby roads.

From here, the plan goes into specifics, and pp. 30-41 are Proposed Trail modifications.  There is a summary of them on pp. 42-43.

Trail Development and Connectivity projects are described on pp. 44-56. There are 40 projects described in the plan. There is an increase in number of miles of trails for MTB’ers of 56%--approximately 55-86 miles through adoption of existing trails and building such as the directional Bug Jr. trail and the Fireline Trail.

Feedback can be submitted by email to  sm.fs.scrd@usda.gov .


Share Post

RECENT ARTICLES

By Kirk Astroth December 19, 2024
Expanding Public Lands Outdoor Recreation Experiences (EXPLORE) Act Passes Congress
By Joni Dean November 12, 2024
8-ish Days of Christmas
By Kirk Astroth October 24, 2024
We know that there have been access issues with the west side of the Hohokam Trail. The railroad right of way is private property and they have posted no trespassing signs and often block the road with boulders or gravel piles. You should not park there. We have been in contact with the railroad and they are unwilling to provide any access and certainly are unwilling to allow parking along the road next to the tracks. Pima County Natural Resources & Parks is aware of the issue and is trying to work out a solution to connect the Hohokam Trail to the Gabe Zimmerman. The long term solution is to extend Hohokam Trail west to connect to the AZT and the Gabe Zimmerman trailhead. For now folks will have to park at McKenzie and ride Hohokam as an out and back from there, or park near 3 Bridges or Gabe Z and use a combination of the AZT, dirt roads and gasline roads to connect. It is legal to park along Agua Verde Road near Marsh Station Road. However there is not much space there. We are working with Pima county to resolve this access issue. Stay tuned.
Share by: